Everything behind the CIS-PPM-006 indicative project configuration in one place: what 500 boards/day means, the rate each department must sustain, an indicative configuration schedule with indicative quantities, an indicative factory space and staffing plan, the route for each part family, the right level of automation, an illustrative 5-year financial scenario with its assumptions, and answers to common buyer questions.
Capacity basis
500 boards/day is accepted board throughput: standard 8 × 4 ft input boards a day converted into accepted parts over two 8-hour shifts, giving about 13,600 sq ft of saleable part area at 85% material yield. At 60% OEE every department must be rated for about 833 boards/day at full speed, so that its slowest step still delivers this throughput.
Capacity figures and OEE 8 figures
Capacity definitions used on this page| KPI | Definition | This package |
|---|
| Machine-rated capacity | Boards/day the machines can process at full speed, before OEE losses | 833 boards/day |
|---|
| Accepted board throughput | Standard 8 × 4 ft input boards a day converted into accepted parts | 500 boards/day |
|---|
| Material yield | Saleable part area ÷ raw board area consumed (offcuts and kerf are the loss) | 85% |
|---|
| Saleable part area | Accepted finished-part area a day after quality inspection | 13,600 sq ft |
|---|
| Finished-board equivalents | Saleable part area ÷ 32 sq ft | 425 a day |
|---|
Accepted board throughput
500
Input boards to accepted parts
Shifts per day
2
8 hours each
Boards per shift
250
8 × 4 ft input boards
Rated capacity needed
833
Boards/day at 100%, = output ÷ 60% OEE
Parts per shift
2,500
At 10 parts per board
Required parts per minute
8.7
288 net minutes per shift
Board area per shift
744 m²
Edges per minute
26
At 3 edged sides per part
Required parts per minute = (250 boards × 10 parts per board) ÷ (8 h × 60 min × 60%) = 8.7 parts per minute
OEE = availability × performance × quality. One illustrative split is 80% × 85% × 88% ≈ 60%. Assumptions: 10 parts per board and 3 edged sides per part. Edges per minute is a workload indicator, not a machine count: the number of edge banders depends on part sizes, running length, sequence, gaps and handling. The bottleneck, usually edge banding or drilling, is confirmed on a standard set of your representative parts.
Package details
Tap a section to open it.
Who this package suits
Large B2B contract manufacturers
Factories supplying modular kitchens, wardrobes and office furniture to builders, brands and retailers at a steady 500 boards per day.
OEM furniture brands
Brands moving from outsourced or semi-automatic production to their own industrial line, with one accountable supplier.
Two-shift operations
About 1,00,000 sq ft of factory space and a 200-person factory crew across two shifts, with space reserved to grow.
Indicative configuration schedule Indicative quantities
Indicative only. Quantities are preliminary planning assumptions sized to this page's machinery budget and output; models and final quantities are fixed in the factory feasibility study from your order dataset, CAD/CAM files and layout. Essential = needed for the stated output; Optional = depends on your products, or a later phase.
Indicative configuration schedule with indicative quantities| Department | Equipment | Qty (indicative) | Application | Required rate | Status |
|---|
| Raw panel store | Floor stacks and racking, vacuum lifter | Racking for about 3 days of panel stock; 1 vacuum lifter | Receipt, stacking, mixed-material stacks for batch-size-1 work | 250 boards per shift | Essential |
|---|
| Lamination | Hot press with calibration; cold press for specials | 0–1 hot press; 1 cold press | Only if you laminate boards in-house | Your laminating volume | Optional |
|---|
| Panel cutting | Rear-loading beam saw | 1 | Stack cutting and single-layer batch-size-1 cutting | 250 boards per shift | Essential |
|---|
| Panel cutting | CNC nesting router | 1 | Shaped and contoured parts | Your shaped-part share | Essential |
|---|
| Panel cutting | Front-loading or sliding table saw | 2 sliding table saws | Thin panels, strips, offcuts, repairs | Thin-part and repair volume | Essential |
|---|
| Edge banding | Automatic edge bander(s) with inline grooving | 3 (2 series, 1 batch-size-1 and specials) | Wide series parts and varied batch-size-1 parts | 26 edges per minute | Essential |
|---|
| Edge banding | Narrow-part handling and return conveyors | 2 return conveyors | Narrow parts and second passes | Your narrow-part share | Optional |
|---|
| CNC drilling | 6-sided CNC drilling centre(s) | 4 | Fronts and non-standard parts | 8.7 parts per minute | Essential |
|---|
| CNC drilling | 4-sided or through-feed drilling | 1 through-feed line | Standard carcass parts, where your construction suits it | Share from your CAD/CAM files | Optional |
|---|
| Inspection | Inline edge and hole-position inspection | Not in base scope | OK or not-OK signal with a repair loop | All parts | Optional |
|---|
| Sorting and kitting | Intermediate stock and kitting carts | About 120 kitting carts; intermediate stock racks | Release parts in pack, assembly or special logic | 2,500 parts per shift | Essential |
|---|
| Sorting and kitting | Automatic sorter | Phase 2: 1 automatic sorter | Later phase when distribution limits output | Phase 2 | Optional |
|---|
| Assembly and packing | Carcass clamp, drawer and front preparation, carton cutting | 2 carcass clamps; 6 drawer and front benches; 0–1 carton cutter | Carcasses and packets for daily orders | Each day's orders | Essential (carton cutting optional) |
|---|
| Utilities | Dust extraction, compressed air, power conditioning and earthing | 1 central dust extraction system; 2 screw compressors (1 duty, 1 standby); 1 power conditioning set | Every machine and the whole building | Sized from connected load | Essential |
|---|
| Software and data | CAD/CAM, part labels with QR or Data Matrix codes; MES prepared for linking | 3 CAM workstations; 4 label printers; MES-ready | Part identity and machine programmes | All parts | Essential |
|---|
Indicative staffing plan by department and shift Planning assumption
Indicative factory space and staffing plan
Two 8-hour production shifts plus a general (day) shift for planning, stores, maintenance and administration, totalling 200 factory staff. Counts are rostered posts: they exclude relief cover for leave and absenteeism (typically add about 10%), trainees, security, contract housekeeping, outsourced transport, and designers, sales, showroom and installation teams.
Indicative staffing by department and shift| Department | Shift A | Shift B | General shift | Total |
|---|
| Raw panel, hardware and finished-goods stores | 8 | 6 | 4 | 18 |
|---|
| Panel cutting (beam saw, nesting, sliding table saws) | 10 | 10 | 0 | 20 |
|---|
| Edge banding | 12 | 12 | 0 | 24 |
|---|
| CNC drilling | 10 | 10 | 0 | 20 |
|---|
| Sorting and kitting | 12 | 12 | 0 | 24 |
|---|
| Assembly and packing | 24 | 20 | 0 | 44 |
|---|
| Dispatch and loading | 6 | 4 | 0 | 10 |
|---|
| Quality and inspection | 4 | 4 | 0 | 8 |
|---|
| Maintenance and utilities | 5 | 5 | 2 | 12 |
|---|
| Production planning, CAM programming and data | 0 | 0 | 8 | 8 |
|---|
| Supervisors and shift leads | 4 | 4 | 2 | 10 |
|---|
| Factory admin, HR and safety | 0 | 0 | 2 | 2 |
|---|
| Total factory staff | 95 | 87 | 18 | 200 |
|---|
The proposed area and staffing figures are preliminary planning assumptions, not a quotation or customer data. Final requirements are established through equipment selection, workflow analysis, factory layout, safety requirements, degree of automation and planned operating shifts.
Indicative factory space plan Planning assumption
Indicative factory space and staffing plan
Shares of about 1,00,000 sq ft (9,290 m²) of covered area, laid out in material-flow order from panel receipt to dispatch. Keep expansion space beside the bottleneck department.
Indicative factory space plan| Zone | Share | sq ft | m² | Notes |
|---|
| Raw panel store and lamination | 14% | 14,000 | 1,301 | Stacks, racking, vacuum lifting; press area if you laminate in-house |
|---|
| Panel cutting and offcut store | 10% | 10,000 | 929 | Saw infeed and outfeed, nesting, labelled offcut racks |
|---|
| Edge banding | 10% | 10,000 | 929 | Machine length plus return-conveyor loops and part buffers |
|---|
| CNC drilling and buffers | 8% | 8,000 | 743 | Buffers in front of each drilling type |
|---|
| Sorting, kitting and intermediate stock | 8% | 8,000 | 743 | Kitting carts or automatic sorter footprint |
|---|
| Assembly and hardware fitting | 12% | 12,000 | 1,115 | Carcass clamps, drawer and front benches |
|---|
| Packing | 6% | 6,000 | 557 | Carton cutting, wrapping, labelling |
|---|
| Finished goods and dispatch staging | 10% | 10,000 | 929 | Staged by truck and site, next to covered docks |
|---|
| Hardware and consumables store | 3% | 3,000 | 279 | Fittings, edge-band rolls, glue, packing material |
|---|
| Utilities: dust extraction, compressed air, electrical | 5% | 5,000 | 465 | Dust collector filter units are often outside the building |
|---|
| Maintenance workshop and spares | 2% | 2,000 | 186 | Tooling, sharpening, critical spares |
|---|
| Offices, CAM and planning, QC, welfare | 5% | 5,000 | 465 | Canteen, toilets, lockers, first aid |
|---|
| Main aisles, fire access and forklift routes | 7% | 7,000 | 650 | Clear marked routes; follow local fire code |
|---|
| Total covered area | 100% | 1,00,000 | 9,290 | |
|---|
Validate the layout for marked material-flow paths, pedestrian and forklift segregation, maintenance clearance, dust-extraction routes, emergency access, fire provisions and expansion space.
What each department must sustain 7 departments
Every department must reach the required rate on accepted parts, after changeovers, rework and inspection. The line is only as fast as its slowest department.
Raw panel store and lamination
250 boards, about 744 m² per shift
Floor stacks plus rack storage to build mixed-material stacks overnight; calibration and a hot press for repeat laminating, and a cold press for specials.
Panel cutting
250 boards, about 2,500 parts per shift
Beam saw output checked for single-layer batch-size-1 work, not only book cutting; nesting for shaped parts; a separate saw for thin panels and offcuts; a labelled offcut store.
Edge banding
About 8.7 parts and 26 edges per minute
Separate routes for wide series parts, varied batch-size-1 parts and narrow parts; inline grooving on the edge bander wherever the groove is within reach.
CNC drilling
About 8.7 parts per minute
The share of 4-sided or through-feed drilling against 6-sided processing is calculated from your CAD/CAM files; 6-sided capacity for fronts and non-standard parts; a balancing buffer in front of each drilling type.
Sorting and kitting
About 2,500 parts per shift
Order carts built with special parts, standard parts from intermediate stock and bought-in hardware, sized from throughput, batch size and packing capacity.
Assembly and packing
Carcasses and packets for each day's orders
Drawers and fronts prepared first; carcass clamp cycle checked against carcasses per shift; cartons cut to size.
Dispatch
Both shifts' packets
Dock height matched to the truck bed, covered loading, and staging space checked against packing lists.
Part families and routes 7 routes
Each part family follows the shortest route that suits its size, thickness and processing. Confirm the routes from your own construction and drilling patterns.
Wide carcass parts
Sides, tops, bottoms, shelves
Beam saw in books → wide-part edge line with inline back-panel grooving → 4-sided or through-feed drilling where your construction suits it, otherwise 6-sided CNC → sorting.
Fronts
Shutters, drawer fronts, handle-groove parts
Beam saw → flexible edge line with quick edge-code change → 6-sided CNC drilling → sorting.
Narrow parts
Up to about 120 mm wide
Cut as multi-part strips → narrow-part edging, crosswise and lengthwise → drilling or edge dowelling → sorting.
Thin parts
8 mm and below: backs, drawer bottoms
Front-loading or sliding table saw → usually no edging; drilling or grooving only where your construction needs it → sorting or packing.
Shaped parts
Curved and contoured parts
CNC nesting, single layer → contour edging → universal assembly and packing.
Thickened parts
Double tops, bed frames, headboards
Pre-drill → screw or glue to double thickness → straight or contour edging → universal line.
Repair and express parts
Rejects and urgent replacements
Repair area with a sliding table saw, a single edge bander and a single drilling CNC → scan back into the flow.
Automation level for this capacity
At 500 boards per day the line is normally built as standalone machines prepared for linking. Connect departments later, when volume, data quality and stable output justify it.
- Phase 1: barcode scanning of stack and part identity, labels printed after cutting, roller tracks, and staff distributing parts by barcode.
- Prepare now for Phase 2: reserve space and interfaces for saw-to-edge transport, drilling buffers and an automatic sorter.
- Typical upgrade trigger: distribution, sorting or missing parts, rather than machine time, begin to limit daily output.
Illustrative 5-year financial scenario Assumptions, P&L, balance sheet
Illustrative financial scenario, not a guaranteed return or bank-approved project report. Package model at 500 boards/day accepted board throughput, two shifts. Total project funding ₹40.19 Cr, of which the machine package ₹20.00 Cr, GST extra.
Assumptions (all visible in the downloadable Excel)
- Accepted board throughput 500 boards/day: standard 8 × 4 ft input boards converted into accepted parts, × 300 operating days × 27.2 sq ft of saleable part area per board (32 sq ft at 85% material yield) = 40.8 lakh sq ft a year. OEE sizes the machines; it is not applied again to revenue.
- Selling price ₹300 per saleable sq ft at the factory gate. Material ₹200 per saleable sq ft, all-in: board including offcuts and kerf at 85% yield (about ₹170 per raw board sq ft), edge band, adhesive, hardware and packing. One blended product mix at full planned output from Year 1, growing as below; a ramp-up case is shown under ROI.
- Salary ₹40,000 per head per month for 200 factory staff; overheads (rent, power, utilities, consumables) 4% of revenue, about half fixed and half variable. Premises assumed leased, with rent inside overheads; land and building are not in project funding.
- Other fixed assets: a provisional 3.5% of revenue for electrical installation, dust-extraction and compressed-air piping, IT, racking and handling, and civil changes, replaced by an itemised capital-expenditure schedule in the feasibility study.
- Depreciation straight line: machines 10%, supporting equipment 20%, other fixed assets 10%. Tax 30%. Interest 12% on the average term-loan balance and on the cash-credit limit.
- Funding: promoter 30% of total project funding; term loan 70% of gross fixed assets, repaid in five equal annual instalments; the balance is a cash-credit limit renewed annually.
- Growth from Year 2: volume +5% a year (OEE improving from 60% towards about 73%, within rated capacity, with no added shift or headcount), selling price +5% and material price +5% a year (gross margin held), salary per head +8% a year, the fixed half of overheads +6% a year and the variable half in line with revenue. Debtors, inventory and creditors grow with sales and are funded from profits; no dividends and no expansion capital expenditure. Surplus cash builds above the 75-day minimum operating buffer while the cash-credit limit stays drawn; in practice it would reduce the cash credit and its interest, so the model is conservative on interest.
- All values exclude GST. GST on machinery (18%) is paid upfront and is normally recoverable as input tax credit, subject to eligibility: a bridge-funding need, not a permanent project cost.
Project funding, ₹ crore| Item | ₹ crore |
|---|
| Machine package price (GST extra) | 20.00 |
|---|
| of which machines | 16.00 |
|---|
| of which supporting equipment | 4.00 |
|---|
| Other fixed assets (provisional allowance) | 4.28 |
|---|
| Net working capital | 15.91 |
|---|
| Total project funding | 40.19 |
|---|
| Promoter equity (30%) | 12.06 |
|---|
| Term loan | 17.00 |
|---|
| Cash credit | 11.13 |
|---|
Working capital build-up, ₹ crore| Item | Basis | ₹ crore |
|---|
| Debtors | 45 days of revenue | 15.09 |
|---|
| Inventory | 30 days of material, salary and overheads (35 days of material) | 7.90 |
|---|
| Cash buffer (minimum operating cash) | 75 days of salary and overheads | 2.98 |
|---|
| Less: creditors | 45 days of material | 10.06 |
|---|
| Net working capital | Cash cycle: 45 + 35 − 45 ≈ 35 days | 15.91 |
|---|
Profit and loss, ₹ crore| ₹ crore | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Trend Y1→Y5 |
|---|
| Revenue | 122.40 | 134.95 | 148.78 | 164.03 | 180.84 | ▲ +10.3% a year, improving |
|---|
| Material (all-in) | 81.60 | 89.96 | 99.19 | 109.35 | 120.56 | ▲ +10.3% a year |
|---|
| Gross profit | 40.80 | 44.98 | 49.59 | 54.68 | 60.28 | ▲ +10.3% a year, improving |
|---|
| Salary | 9.60 | 10.37 | 11.20 | 12.09 | 13.06 | ▲ +8.0% a year |
|---|
| Overheads | 4.90 | 5.29 | 5.73 | 6.20 | 6.71 | ▲ +8.2% a year |
|---|
| EBITDA | 26.30 | 29.32 | 32.67 | 36.39 | 40.51 | ▲ +11.4% a year, improving |
|---|
| Depreciation | 2.83 | 2.83 | 2.83 | 2.83 | 2.83 | → steady |
|---|
| Interest, term loan | 1.84 | 1.43 | 1.02 | 0.61 | 0.20 | ▼ −1.63, improving |
|---|
| Interest, cash credit | 1.34 | 1.34 | 1.34 | 1.34 | 1.34 | → steady |
|---|
| Profit before tax | 20.30 | 23.73 | 27.48 | 31.61 | 36.14 | ▲ +15.5% a year, improving |
|---|
| Tax (30%) | 6.09 | 7.12 | 8.25 | 9.48 | 10.84 | ▲ +15.5% a year |
|---|
| Profit after tax | 14.21 | 16.61 | 19.24 | 22.13 | 25.30 | ▲ +15.5% a year, improving |
|---|
Balance sheet at year end, ₹ crore (assets equal liabilities every year)| ₹ crore | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Trend Y1→Y5 |
|---|
| Share capital (promoter equity) | 12.06 | 12.06 | 12.06 | 12.06 | 12.06 | → steady |
|---|
| Reserves (retained profit) | 14.21 | 30.82 | 50.06 | 72.19 | 97.49 | ▲ +83.28 |
|---|
| Net worth | 26.27 | 42.88 | 62.12 | 84.25 | 109.55 | ▲ +42.9% a year, improving |
|---|
| Term loan outstanding | 13.60 | 10.20 | 6.80 | 3.40 | 0.00 | ▼ −13.60, improving |
|---|
| of which due within 12 months | 3.40 | 3.40 | 3.40 | 3.40 | 0.00 | ▼ −3.40, improving |
|---|
| Cash credit (limit held) | 11.13 | 11.13 | 11.13 | 11.13 | 11.13 | → steady |
|---|
| Creditors | 10.06 | 11.09 | 12.23 | 13.48 | 14.86 | ▲ +10.3% a year |
|---|
| Total equity and liabilities | 61.06 | 75.30 | 92.28 | 112.26 | 135.54 | ▲ +22.1% a year |
|---|
| Net fixed assets | 21.46 | 18.63 | 15.80 | 12.97 | 10.14 | ▼ −11.31 |
|---|
| Debtors | 15.09 | 16.64 | 18.34 | 20.22 | 22.30 | ▲ +10.3% a year |
|---|
| Inventory | 7.90 | 8.68 | 9.54 | 10.49 | 11.53 | ▲ +9.9% a year |
|---|
| Cash and bank, incl. buffer | 16.62 | 31.36 | 48.60 | 68.58 | 91.57 | ▲ +53.2% a year, improving |
|---|
| Total assets | 61.06 | 75.30 | 92.28 | 112.26 | 135.54 | ▲ +22.1% a year |
|---|
Cash-flow statement, ₹ crore (closing cash equals the balance sheet)| ₹ crore | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 |
|---|
| Opening cash and bank | 2.98 | 16.62 | 31.36 | 48.60 | 68.58 |
|---|
| Cash accrual (PAT + depreciation) | 17.04 | 19.44 | 22.07 | 24.96 | 28.13 |
|---|
| Change in working capital | 0.00 | -1.30 | -1.43 | -1.57 | -1.73 |
|---|
| Term-loan principal repaid | -3.40 | -3.40 | -3.40 | -3.40 | -3.40 |
|---|
| Net cash flow | 13.64 | 14.74 | 17.24 | 19.98 | 23.00 |
|---|
| Closing cash and bank | 16.62 | 31.36 | 48.60 | 68.58 | 91.57 |
|---|
Operational efficiency ratios| Ratio | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Trend Y1→Y5 |
|---|
| Revenue growth | — | 10.3% | 10.2% | 10.3% | 10.3% | → steady |
|---|
| Volume index (Year 1 = 100) | 100.0 | 105.0 | 110.2 | 115.8 | 121.6 | ▲ +5.0% a year, improving |
|---|
| Gross margin | 33.3% | 33.3% | 33.3% | 33.3% | 33.3% | → steady |
|---|
| Material, % of revenue | 66.7% | 66.7% | 66.7% | 66.7% | 66.7% | → steady |
|---|
| Salary, % of revenue | 7.8% | 7.7% | 7.5% | 7.4% | 7.2% | ▼ −0.6 pp, improving |
|---|
| Overheads, % of revenue | 4.0% | 3.9% | 3.8% | 3.8% | 3.7% | ▼ −0.3 pp, improving |
|---|
| Revenue per head (₹ lakh) | 61.2 | 67.5 | 74.4 | 82.0 | 90.4 | ▲ +10.3% a year, improving |
|---|
| Asset turnover (revenue ÷ total assets) | 2.00× | 1.79× | 1.61× | 1.46× | 1.33× | ▼ −0.67×, weakening |
|---|
| Fixed-asset turnover | 5.70× | 7.24× | 9.42× | 12.65× | 17.83× | ▲ +12.13×, improving |
|---|
| Debtor days | 45 | 45 | 45 | 45 | 45 | → steady |
|---|
| Inventory days (on material) | 35 | 35 | 35 | 35 | 35 | → steady |
|---|
| Creditor days | 45 | 45 | 45 | 45 | 45 | → steady |
|---|
| Cash conversion cycle (days) | 35 | 35 | 35 | 35 | 35 | → steady |
|---|
Financial ratios| Ratio | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Trend Y1→Y5 |
|---|
| EBITDA margin | 21.5% | 21.7% | 22.0% | 22.2% | 22.4% | ▲ +0.9 pp, improving |
|---|
| PAT margin | 11.6% | 12.3% | 12.9% | 13.5% | 14.0% | ▲ +2.4 pp, improving |
|---|
| ROCE | 46.0% | 41.3% | 37.3% | 34.0% | 31.2% | ▼ −14.8 pp, weakening |
|---|
| ROE on average equity | 74.2% | 48.0% | 36.6% | 30.2% | 26.1% | ▼ −48.1 pp, weakening |
|---|
| PAT on initial promoter equity | 117.9% | 137.8% | 159.6% | 183.5% | 209.8% | ▲ +92.0 pp, improving |
|---|
| Current ratio | 1.61× | 2.21× | 2.86× | 3.54× | 4.82× | ▲ +3.21×, improving |
|---|
| Quick ratio | 1.29× | 1.87× | 2.50× | 3.17× | 4.38× | ▲ +3.09×, improving |
|---|
| Debt (TL + CC) ÷ net worth | 0.94× | 0.50× | 0.29× | 0.17× | 0.10× | ▼ −0.84×, improving |
|---|
| Debt ratio (liabilities ÷ assets) | 57.0% | 43.1% | 32.7% | 25.0% | 19.2% | ▼ −37.8 pp, improving |
|---|
| Interest coverage (EBITDA ÷ interest) | 8.29× | 10.61× | 13.87× | 18.68× | 26.30× | ▲ +18.01×, improving |
|---|
| DSCR (years with term-loan repayment) | 3.61× | 4.32× | 5.22× | 6.37× | 7.86× | ▲ +4.26×, improving |
|---|
Project free cash flow, ₹ crore (Year 0 = total project funding)| ₹ crore | Year 0 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 |
|---|
| Project free cash flow (after tax, after working capital, before financing) | -40.19 | 19.26 | 20.07 | 22.29 | 24.74 | 27.47 |
|---|
| Cumulative | -40.19 | -20.93 | -0.86 | 21.43 | 46.18 | 73.65 |
|---|
Reading the trend: margins improve slowly because salaries and fixed overheads grow more slowly than revenue, while gross margin is held because selling and material prices move together. ROCE and ROE on average equity ease because retained profit and cash build up on the balance sheet; surplus cash would first reduce cash-credit use. Growth depends on orders and price acceptance; the sensitivity and ramp-up cases below show the downside.
Cash-accrual coverage period: cumulative cash accruals equal initial bank finance of ₹28.13 Cr in about 1.7 years under these assumptions. This is not a loan-repayment commitment: the term loan is repaid over five years, as the balance sheet and cash-flow statement show, and the cash-credit limit is assessed separately. Project payback on free cash flow is about 2.0 years. Scroll sideways on mobile to see all years.
ROI and bankability ratios ROCE, DSCR, payback
Illustrative financial scenario, not a guaranteed return or bank-approved project report. Year 1 of the reconciled package model, at 500 boards/day accepted board throughput, ₹300 per saleable sq ft, ₹40,000 average monthly salary and 30:70 equity-to-bank funding.
ROCE − WACC spread
34.7 pp
ROCE 46.0% less post-tax WACC 11.3%
Minimum DSCR, loan life
3.61×
Average 5.48× while the term loan runs
Cash-accrual coverage period
1.7 years
Initial bank finance ÷ Year-1 cash accrual; not a repayment date
Project payback
2.0 years
Cumulative project free cash flow
Total funding coverage
2.4 years
Total funding ÷ Year-1 cash accrual
Year-by-year margins, returns, liquidity, leverage and DSCR are in the financial ratios table above.
Bankability view in three stages| Stage | Measure | This model | Illustrative screening criterion |
|---|
| Initial funding | Bank debt (TL + CC) ÷ promoter equity | 2.33× | Assessed with collateral and promoter profile |
|---|
| Initial funding | Promoter contribution | 30% | ≥ 25% margin |
|---|
| Initial funding | Term loan ÷ gross fixed assets | 70% | ≤ 75% |
|---|
| Year 1 | Current ratio (current portion of term loan in current liabilities) | 1.61× | ≥ 1.33× |
|---|
| Year 1 | Quick ratio | 1.29× | ≥ 1.00× |
|---|
| Year 1 | DSCR | 3.61× | ≥ 1.50× |
|---|
| Year 1 | Debt (TL + CC) ÷ closing net worth | 0.94× | ≤ 2.00× |
|---|
| Year 1 | Interest coverage (EBITDA ÷ interest) | 8.29× | ≥ 2.00× |
|---|
| Year 1 | ROCE / EBITDA margin / PAT margin | 46.0% / 21.5% / 11.6% | ≥ 12% / 12% / 5% |
|---|
| Loan life | Minimum / average DSCR while the term loan runs | 3.61× / 5.48× | ≥ 1.50× |
|---|
| Loan life | Current ratio range, Years 1–5 | 1.61× – 4.82× | ≥ 1.33× |
|---|
The criteria are illustrative screening levels used in this model, not universal bank approval requirements. Each lender applies its own norms by applicant, collateral, loan type, industry risk and projected cash flows. DSCR = (PAT + depreciation + term-loan interest) ÷ (term-loan principal + term-loan interest): it covers scheduled term-loan service only; cash-credit interest is already deducted in PAT, and the cash-credit limit is revolving, with no scheduled principal. The current portion of the term loan is shown inside current liabilities; the total term-loan liability is unchanged.
Year-1 sensitivity, ₹ crore (same funding)| Scenario | Revenue | EBITDA | PAT | DSCR | Coverage period |
|---|
| Base case | 122.40 | 26.30 | 14.21 | 3.61× | 1.7 years |
|---|
| Volume −15% | 104.04 | 20.55 | 10.19 | 2.84× | 2.2 years |
|---|
| Selling price −5% | 116.28 | 20.31 | 10.01 | 2.80× | 2.2 years |
|---|
| Material cost +5% | 122.40 | 22.22 | 11.36 | 3.06× | 2.0 years |
|---|
| Combined stress: volume −15%, price −5%, material +5%, interest 13%, debtors 60 days | 98.84 | 11.99 | 3.63 | 1.57× | 5.0 years |
|---|
| Optimistic: volume +5%, price +3%, material −2% | 132.38 | 33.71 | 19.40 | 4.60× | 1.3 years |
|---|
Ramp-up case, ₹ crore (debt schedule unchanged)| ₹ crore | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 |
|---|
| Utilisation | 70% | 85% | 100% | 100% | 100% |
|---|
| Revenue | 85.68 | 114.70 | 148.78 | 164.03 | 180.84 |
|---|
| EBITDA | 14.80 | 22.97 | 32.67 | 36.39 | 40.51 |
|---|
| Profit after tax | 6.16 | 12.16 | 19.24 | 22.13 | 25.30 |
|---|
| DSCR | 2.07× | 3.40× | 5.22× | 6.37× | 7.86× |
|---|
Scenarios hold salaries and the fixed half of overheads; variable overheads and material move with volume; extra debtor days are funded by cash credit. They are illustrative recomputations, not forecasts; your feasibility study tests your own prices, costs and ramp-up.
What the feasibility study confirms
- Your order dataset: total parts, unique designs, part-family mix, material and edge-code variety.
- The bottleneck department and accepted output per shift for each department at your mix, not catalogue feed speed.
- Machine quantities, models and options for every line in the configuration schedule.
- Factory zoning: raw panel store, cutting, edging, drilling, sorting, assembly, packing, finished goods, dispatch, utilities, dust extraction and expansion space.
- Manpower by department and shift, including supervisors, maintenance, quality and stores.
- Part size windows, materials, surfaces (including high-gloss or protective film) and permitted laminate overhang.
- Part labelling with a unique QR or Data Matrix code, and the data interfaces between design software, MES and each machine.
- Ramp-up, selling price, material cost and working-capital days from your own business, turned into a project report for your bank.
- Required rate → proposed capacity → headroom for each department, from cycle times on a standard set of your representative parts: saw stack height, pattern efficiency and changeovers; edge-banding feed speed, gaps, returns and glue changes; drilling patterns and tool changes; sorting buffer positions; assembly and packing rates.
- Utilities: dust-extraction air volume, compressed-air pressure and flow, and connected electrical load with safety margins.
- An itemised capital-expenditure schedule (electrical, dust extraction, compressed air, IT, racking, civil changes) and the premises basis: owned, leased, new build or existing.
- Reference parts agreed before ordering, and an acceptance test proven on them at installation.
Questions about the 500 boards/day package 14 FAQs
What is the 500 boards/day industrial line package?
It is an indicative project configuration for a turnkey automatic cabinet manufacturing line for modular kitchens, wardrobes and office furniture, planned for 500 boards/day of accepted board throughput over two shifts. Caple Industrial Solutions supplies it under one accountable contract with pan-India service, after a factory feasibility study confirms the configuration. The 1,000 boards/day package suits larger volumes.
What does 500 boards/day measure?
Accepted board throughput: 500 standard 8 × 4 ft input boards a day converted into accepted parts. At 85% material yield that is about 13,600 sq ft of saleable part area a day, or about 425 finished-board equivalents (saleable area ÷ 32 sq ft). Because real lines run at about 60% overall equipment effectiveness (OEE), each department must be rated for about 833 boards/day at full speed. The financial scenario sells exactly this saleable area; OEE is not applied a second time.
How many boards per shift and parts per minute must the line produce?
Over two 8-hour shifts at 60% OEE there are 288 net minutes per shift. At 10 parts per board, 500 boards/day means 250 boards per shift, about 2,500 parts per shift, 8.7 parts per minute and 744 m² of board per shift. Recalculate with your own order data, as wardrobe and project work can raise parts per board well above 10.
What investment, factory area and manpower does the package assume?
Machine package price ₹20.00 crore (GST extra), covering machines ₹16.00 crore and supporting equipment ₹4.00 crore. Total project funding is ₹40.19 crore: the machine package, other fixed assets such as electricals, IT and racking ₹4.28 crore, and net working capital ₹15.91 crore. Funding assumes 30% promoter equity (₹12.06 crore), a term loan of ₹17.00 crore and a cash-credit limit of ₹11.13 crore. The factory needs about 1,00,000 sq ft and 200 factory staff across two shifts, excluding designers, sales, showroom and installation teams.
How is the bank loan repaid, and is the return guaranteed?
In the illustrative scenario the term loan follows a five-year schedule of equal annual instalments of ₹3.40 crore, and the cash credit stays as a renewable working-capital limit. Year-1 cash accrual (profit after tax plus depreciation) is ₹17.04 crore, so the indicative cash-accrual coverage period is about 1.7 years; this is not a loan-repayment commitment. DSCR is 3.61× in Year 1. In a combined stress case (volume −15%, price −5%, material +5%, interest 13%, debtors 60 days) DSCR falls to about 1.57×. This is not a guaranteed return or a bank-approved project report; it depends on confirmed orders, selling price, material cost, wages, utilisation and financing terms.
Should I choose the 500 or the 1,000 boards/day package?
Choose from confirmed demand, not ambition. Convert your order book into parts per shift, identify the bottleneck department, then check cash flow, loan repayments, space and team readiness. Many manufacturers start at 500 boards/day with standalone machines prepared for linking, and add capacity or connected automation when orders, data quality and stable output justify it.
What requirements do I need to send?
Send the project requirements list in six areas: general requirements (products, processes, capacity, raw materials, workpiece size range, production mode, space and a rough layout), raw materials warehouse, sizing, edge banding, drilling and sorting. Add a representative export of real orders with total parts, unique designs and the share of each part family, taken from your CAD/CAM or order system.
What raw material storage does the line need?
Floor stacks plus rack storage are often enough at 500 boards/day, with mixed-material stacks built overnight for batch-size-1 work. State panel sizes, stacking quantities, loading bays, the machines to connect and the data file format.
What panel cutting capacity is needed?
The line must cut about 250 boards per shift. Check beam saw output for single-layer batch-size-1 work, not only stack cutting, and consider nesting for shaped parts and a separate saw for thin panels and offcuts. Confirm saw quantities from your cutting patterns and actual cycle times.
What edge banding capacity is needed?
At an average of three edged sides per part, the line must band about 26 edges per minute. Edge banding is a frequent bottleneck, so confirm it with your real edged sides, part lengths, edge types and changeovers. Plan separate routes for wide series parts, varied batch-size-1 parts and narrow parts. Select the adhesive from substrate, moisture and heat exposure, application conditions and maintenance, not by product type alone.
What CNC drilling capacity is needed?
Drilling must keep pace with about 8.7 parts per minute. Use your CAD/CAM files to calculate the share of parts suited to 4-sided or through-feed drilling and the share needing 6-sided processing; this depends on your hardware, drilling patterns and construction. Compare actual cycle times for reference parts rather than rule-of-thumb speed ratios, and place a buffer in front of each drilling type.
How should sorting, assembly and packing be planned?
Sorting must handle about 2,500 parts per shift, typically with intermediate stock and kitting carts. Size it from throughput, part-mix variability, batch size and the discharge capacity of assembly and packing. Prepare drawers and fronts before carcass assembly, check the carcass clamp cycle against carcasses per shift, and cut cartons to size.
What level of automation suits this package?
Build standalone machines prepared for linking: barcode scanning, labels printed after cutting and roller tracks. Reserve space and interfaces for saw-to-edge transport, drilling buffers and an automatic sorter, and connect each department only after it is proven.
How is the package capacity validated before I order?
A factory feasibility study reviews your order dataset and requirements list, then confirms the bottleneck department, accepted output per shift for each department, machine quantities, zoning and layout, manpower by department and shift, labelling and data interfaces, and utilities. Reference parts are agreed before ordering and the acceptance test is proven on them at installation.
Request a factory feasibility study for 500 boards/day
Send your order data and requirements list. We confirm the bottleneck, machine quantities, zoning and layout, department and shift manpower, and a project report your bank can appraise.
Or send your factory planning brief from the project requirements list, or WhatsApp +91 70454 59931.
Related guides
Illustrative financial scenario, not a guaranteed return or bank-approved project report. Machinery prices are indicative; the machine list, quantities, capacities, cycle times, staffing, layout and investment are confirmed in a written, project-specific proposal from Caple Industrial Solutions. Customer layouts and project data stay in the private proposal. Revised 26 October 2026: capacity definitions, cash-accrual coverage, three-stage bankability, cash flow and sensitivity added. Warranty shown on this page: limited to manufacturing defects in supplied machines, back-to-back with the manufacturer's policy, subject to full payment; wear parts and consumables are excluded. Installation, commissioning, training and after-sales scope are fixed in the written proposal.
Download the Nanxing catalogue
Nanxing catalogue 2025 Q3: panel saws and CNC cutting, edge banders, CNC drilling, sorting and packing, and automation lines. PDF, Chinese and English, 60 pages, 7.4 MB.
Download catalogue PDF (7.4 MB)